SYSTEM

TOP

Quality Control SystemGlobal shinhwa Co.,Ltd. creates value with technology

Quality Policy and Goal

  • icon_png Mission

    We make the world's best products by practicing technology management, customer-centered management, and communication management philosophy based on the spirit of creation and challenge.

  • icon_png Quality Policy

    Customer satisfaction by guaranteeing product reliability

  • icon_png Quality Goal

    Zero defect rate and 100% delivery compliance rate

Quality System Model

Management Responsibility

Management Review / Customer-oriented Marketing

Quality Policy / Organizational Goal

Quality Management System

Resource Usage Management

Document Management / Educational Training

Improvement of Infrastructure and Workplace Environment

Information Collection and Management / Quality Record

Measurements /Analysis / Improvements

Internal Quality Audit / Management Review

Non-conforming Product Management / Correction and Preventive Measures

Measurement and Monitoring / Ongoing Improvement

Production Realization

Review and Communicate Customer Requirements

Purchasing/Production and Service Operation

Measurement and Product Monitoring Equipment Management

Design & Specification control

Design & Specification Control

Design Calculations & Fabrication Drawings By ASME, CSEL, KGS, BV, PED, etc.

Production Realizing

Purchase Order Specification Purchase Order Requisition Purchase Order for Material Meterial Control Welding Control Heat Treatment Control (insruction) Surface Treatment Control

Record Retention

Manufacture's Data Report Fabrication Drawings Material Test Report and Certification Pressure Parts Documentations Weliding Procedure Specification Procedure Qualification Record NDE Report and Films Repair Procedure and Records Traveler Heat Treatment Records and Test Result NCR and Disposition Preussure Test records

Examination & Inspection System

Inspection & Test Plan/Procedure Receiving Inspection for Material MTR Verification Welding Visual & Suitability Examination Non-destructive Examination Pressure Test & Leak Test Calibration Control of Measuring & Test Equipment

Activities of Development & Improvement

Quality Control System

Internal Audit Internal Procedure for Lining Test 3(Three) stages NCR System Internal Procedure for Surface Treatment Quality Control Manual & Procedure(ASME) Internal Procedure for Packing Quality Control Manual & Procedure(CSEL) Internal Procedure for General Requirements(Vessel) Quality Control Manual & Procedure(ISO & OHSAS) Revision for New Edition(ASME)

Welding

Weldment(Filer metal) Verification Variable of Welding Stability Data Collection - Welding Performance Qualification - Welding Performance Specification - Performance Qualification Record Attendance of Technical Conference(Seminar)

Base Metal(Material)

Meterial Test Report Verification - Chemical Composition - Mechanical Properties - Other Requirements Simulation Test (by ASME) Production Test (by ASME)